Custom Fab Project Award

Duro-Last® 2022 Custom-Fabrication Award

Contractor: Damschroder Roofing

Project Arch Building, The Andersons

Location: Maumee, Ohio

Square Feet: 43,254

 

Products: Duro-Last® custom-fabricated tan 50 mil membrane, Duro-Guard® XPS insulation, Duro-Last stainless-steel fasteners, curbs, stacks and custom end caps, stainless-steel vented ridge caps, parapet flashings, galvanized roof anchors, EXCEPTIONAL® Metals’ stainless-steel plates, EXCEPTIONAL Metals’ 2-Piece Base, T-Edge skirt.

 

Jim Collins, owner of The Andersons, Inc., grew weary of the maintenance and expense of replacing asphalt shingles that would fly off the arch building after a windstorm. In 2021, Collins determined protecting 61,000 tons of dry fertilizer was worth investing in a new roof. He knew Damschroder Roofing would be up for the job.  

“In this case, they couldn’t get shingles to stay on the roof because every time they’d have a windstorm they’d lose shingles,” said Dana Howell, president of Damschroder Roofing. “So they were getting nickeled and dimed with replacements and maintenance.”

The arch building defies the typical low-slope or flat roof of many Duro-Last membrane installs. However, Damschroder knew the new roof needed to stand up to strong Midwest winds and last a minimum of 25 years. Shingles would not work; they would fly off again. Collins was sold on the recommendation of a Duro-Last Roofing System: a custom-fabricated membrane to minimize on-site welds with mechanically fastened stainless-steel fasteners and edge metals. Stainless steel withstands the corrosiveness of the fertilizer.

The biggest challenge and number one priority during this project was the safety of the installers. Because of the pitch of the roof, a tie-off was required for the entirety of the job. Many mornings the crew faced a slippery slope from morning dew.

“We have phenomenal installers who literally repel from the ridge down when they do these types of installs,” Howell said. “They’re mountain climbers. They’re very, very good at it.”

The Duro-Last Roofing System was installed over the entire roof deck, up and over the parapet walls for complete encapsulation, including vent flashings and terminations. The roof deck was cut along the peak and replaced with new stainless-steel vented ridge caps. Vinyl siding was removed from parapet walls and Duro-Guard XPS fan-fold insulation was installed to reduce heat escape and protect it from moisture penetration before the Duro-Last membrane was installed.

Duro-Last’s custom-fabricated rolls are designed to easily roll down a flat roof. One challenge of this job was the logistics of getting, and keeping, the 5-foot wide rolls of tan 50 mil Duro-Last membrane secured on the ridge because of the roof’s pitch. It required a crane capable of reaching the height and width of the building, and installing temporary safety tie-off D-rings for the removal of the existing roof and installation of the new.

Stainless-steel fasteners were used, tying into a shingle-covered addition. Terminations include a 3” welding arched drip edge of 100 mil aluminum along the vertical perimeter, and 3” stainless-steel T-Edge for the lower perimeter edges. For extra support, four new galvanized roof anchors were installed.

After the membrane was installed, the parapet walls were re-covered with vinyl siding to maintain aesthetics, connecting the arch to the recent addition.

“We were able to accomplish the task and it was fun,” Howell said. “I’m not sure that the installers would say it was fun, but they did what they do best and they hit it out of the park.”